Aqua Line (Pune Metro): Difference between revisions

From Wikipedia, the free encyclopedia

Content deleted Content added


Tags: Mobile edit Mobile web edit

 

Line 113: Line 113:

|नळ स्टॉप

|नळ स्टॉप

|6 March 2022

|6 March 2022

|Line 4A

|None

|Elevated

|Elevated

|-

|-

Line 218: Line 218:

|खराडी बायपास

|खराडी बायपास

|Approved

|Approved

|Line 4

|None

|Elevated

|Elevated

|-

|-


Latest revision as of 05:19, 27 November 2025

Rapid transit railway line of Pune Metro

Line 2 (Aqua Line)

Pune Aqua line

Status Operational
Locale Pune
Termini
Stations 16 (Operational)
Type Rapid Transit
System Pune Metro
Operator(s) MahaMetro
Rolling stock Titagarh Firema
Opened 6 March 2022; 3 years ago (2022-03-06)
Completed 6 March 2024 (2024-03-06)
Line length 14.66 km (Operational)
Character Elevated

Line 2 (Aqua Line) of the Pune Metro is the second line of the city’s mass transit network. It runs from Ramwadi to Vanaz, passing through key locations such as Mangalwar Peth and Deccan Gymkhana. The section from Vanaz to Garware College was inaugurated on 6 March 2022 by Prime Minister Narendra Modi. The extension from Garware College to Ruby Hall Clinic was opened on 1 August 2023, and the remaining stretch to Ramwadi was completed and inaugurated on 6 March 2024.[1]

The Aqua Line of the Pune Metro is an elevated line covering a distance of 14.66 km (9.11 mi) and includes 16 stations. It connects with the Line 1 (Purple Line) and Line 3 at the District Court interchange station. The maintenance depot for the Aqua Line is situated near the Vanaz station on land previously used as a garbage depot.[2][3]

Following is a list of stations on this route-

Aqua Line
# Station name Opening Connections Layout
English Marathi
1 Chandni Chowk चांदणी चौक Approved None Elevated
2 Kothrud Bus Depot कोथरूड बस डेपो Approved PMPML Elevated
3 Vanaz वनाझ 6 March 2022 None Elevated
4 Anand Nagar आनंद नगर 6 March 2022 None Elevated
5 Ideal Colony आयडियल कॉलनी 6 March 2022 None Elevated
6 Nal Stop नळ स्टॉप 6 March 2022 Line 4A Elevated
7 Garware College गरवारे महाविद्यालय 6 March 2022 None Elevated
8 Deccan Gymkhana डेक्कन जिमखाना 1 August 2023 Deccan Gymkhana PMPML Bus Station Elevated
9 Chhatrapati Sambhaji Udyan छत्रपती संभाजी उद्यान 1 August 2023 None Elevated
10 PMC Bhavan पुणे महानगरपालिका भवन 1 August 2023 None Elevated
11 District Court Pune जिल्हा न्यायालय पुणे 1 August 2023 Purple Line & Pink Line Elevated
12 Mangalwar Peth आर.टी.ओ पुणे 1 August 2023 None Elevated
13 Pune Railway Station पुणे रेल्वे स्थानक 1 August 2023 Pune Junction Elevated
14 Ruby Hall Clinic रुबी हॉल क्लिनिक 1 August 2023 None Elevated
15 Bund Garden बंड गार्डन 6 March 2024 None Elevated
16 Yerwada येरवडा 21 August 2024 Rainbow BRTS Elevated
17 Kalyani Nagar कल्याणी नगर 6 March 2024 Rainbow BRTS Elevated
18 Ramwadi रामवाडी 6 March 2024 Rainbow BRTS Elevated
19 Viman Nagar विमान नगर Approved None Elevated
20 Somnath Nagar सोमनाथ नगर Approved None Elevated
21 Kharadi Bypass खराडी बायपास Approved Line 4 Elevated
22 Tulaja Bhavani Nagar तुळजा भवानी नगर Approved None Elevated
23 Ubale Nagar उबाळे नगर Approved None Elevated
24 Upper Kharadi Road अप्पर खराडी रस्ता Approved None Elevated
25 Wagheshwar Temple वाघेश्वर मंदिर Approved None Elevated
26 Wagholi वाघोली Approved None Elevated
27 Siddharth Nagar सिद्धार्थ नगर Approved None Elevated
28 Bakori Phata बकोरी फाटा Approved None Elevated
29 Vitthalawadi विठ्ठलवाडी Approved None Elevated

The Aqua Line utilises the Alstom Urbalis 400 communications-based train control (CBTC) signalling system. Alstom was awarded a EUR90 million contract to supply the signalling and telecommunications systems for the Aqua and Purple Lines, as well as Mumbai Metro Line 2 and Line 7.[4][5]

Leave a Comment

Your email address will not be published. Required fields are marked *

Exit mobile version