Medical college and hospital in Bihar, India
Government Medical College and Hospital, Mahuais an under-construction government medical college and teaching hospital in Mahua, Vaishali district, Bihar, India. The institution is being established by the Government of Bihar to expand medical education and healthcare facilities in the region. Upon completion, the college will offer 100 MBBS seats annually along with a 500-bed teaching hospital.[1][2]
The Government of Bihar approved the establishment of a new medical college at Mahua in order to strengthen healthcare and medical education. The project commenced in 2021, and is being developed on a land parcel of 20 acres with a total built-up area of 1,221,099 sq ft. The estimated project cost is ₹462 crore.[3]
The campus has been planned with four major components:
- Academic Block
- Hospital Block
- Ancillary Blocks (including Dharamshala, Gymnasium, Recreation Centre, etc.)
- Residential Blocks
Hospital and Academic Facilities
[edit]
- Hospital Block: Basement + Ground + 5 floors
- Academic Block: Ground + 1 floor
Ancillary Facilities
[edit]
- Recreation Centre: Ground + 1 floor
- Recreational Block: Ground + 2 floors
- Dharamshala: Ground + 2 floors
Residential Facilities
[edit]
- B.Sc. Nursing College: Ground + 6 floors
- Boys’ Hostel: Ground + 6 floors
- Girls’ Hostel: Ground + 6 floors
- Intern Hostels (Boys & Girls): Ground + 4 floors
- Nurse Hostel: Ground + 3 floors
- Junior Resident Hostel: Ground + 4 floors
- Type V Quarters: Ground + 1 floor
- Type IV Quarters: Ground + 5 floors
- Type II Quarters: Ground + 3–4 floors
- Director’s and Medical Superintendent’s Residences (2 blocks): Ground + 1 floor
- Multi-level Car Parking: Ground + 6 floors
| Item | Details |
|---|---|
| Project Name | Government Medical College & Hospital, Mahua |
| Location | Mahua, Vaishali district, Bihar |
| Coordinates | 25.811653°N, 85.414338°E |
| Sector | Public |
| Building Use | Healthcare, Educational, Residential |
| Construction Area | 1,221,099 sq ft |
| Estimated Cost | ₹462 crore |
| Construction Start | 2021 |
| Expected Completion | 2026 |
| Status | 80% completed as of September 2025 |
Contractors and consultants
[edit]
- Design Architect: Design Associates Inc.
- MEP Consultant: ARK Consultants
- Civil Works Contractors: Cube Construction Engineering Limited and Katira Construction Limited (KCI–CCEL Joint Venture)