==History==
==History==
The Automated Track Inspection Program (ATIP) is a division of the [[Federal Railroad Administration]] (FRA) which oversees automated [[track inspection]]s on railroads in the [[United States]]. At the time, the FRA focused its automated track inspections for frequently used railroad lines, especially lines which carried [[hazardous materials]] and passengers. Track inspections would have to be <em>automated</em>, as opposed to regular inspections where subtle track defects would be difficult to identify.<ref name=”FRA-2008″/>
The Automated Track Inspection Program (ATIP) is a division of the [[Federal Railroad Administration]] (FRA) which oversees automated [[track inspection]]s on railroads in the [[United States]]. At the time, the FRA focused its automated track inspections for frequently used railroad lines, especially lines which carried [[hazardous materials]] and passengers. Track inspections would have to be <em>automated</em>, as opposed to inspections where subtle track defects would be difficult to identify.<ref name=”FRA-2008″/>
DOTX 219 was built by [[ENSCO]], [[Plasser & Theurer]], and [[Colorado Railcar]], as part of a contract for two new track geometry cars, with the other of which being DOTX 220.<ref name=”Zdmira”>{{cite news
DOTX 219 was built by [[ENSCO]], [[Plasser & Theurer]], and [[Colorado Railcar]], as part of a contract for two new track geometry cars, with the other of which being DOTX 220.<ref name=”Zdmira”>{{cite news
American self-propelled track geometry car
FRA DOTX 219 (commonly shortened to DOTX 219; originally known as T-19) is a self-propelled track geometry car owned by the Automated Track Inspection Program (ATIP), a division of the Federal Railroad Administration (FRA) in the United States. DOTX 219 measures several different aspects of track geometry, such as track gauge and rail cant. DOTX 219 was built by ENSCO, Plasser & Theurer, and Colorado Railcar, and began service in late April 2007. DOTX 219 and its collected data has had several uses, such as in train derailment investigations.
DOTX 219 has several systems onboard for measuring different aspects of track geometry.[1][2]: 1 The Track Geometry Measurement System (TGMS) measures track gauge (the width between the rails), rail cant (how much higher one rail is to the other), and calculates speed limits for curves; the Transverse Rail Profile System (TRPS) measures rail profile (the shape of the rail) in real time; the Differential Global Positioning System DGMS/LDS (DGPS) uses a geographic coordinate system to give coordinates to a track defect; and the Ride Quality Measurement System (RQMS) measures the ride quality for passenger trains.[2]: 1 [3][4]: 55821 DOTX 219 is able to use its measurement systems up to 125 miles per hour (201 km/h), and is able to process data up to 200 miles per hour (320 km/h).[3][5][6] DOTX 219 can move under its own power, but it can also be towed by a locomotive.[7][8][a]
DOTX 219 uploads its collected track data to the Track Data Management System (TDMS) – an archive of track data collected since 1998 – via the satellite-based Mobile Broadband Internet System (MBIS).[b] The crew of DOTX 219 uses the Digital Survey Log (DSL) to log information about a survey’s progress and delays. The crew also uses the Digital Track Notebook (DTN), a handheld computer which can be used as a reference manual for railroad regulations, and can synchronize data from the aforementioned measurement systems.[2]: 1 DOTX 219 can determine if track is defective; however, it cannot determine if faultless track is about to become defective.[5][6]
The amenities inside of DOTX 219 include closets, five lockers, one bathroom, a galley, a server room, and a rear observation area.[2]: 2 [1] DOTX 219 has operating controls only on its front end, which is designated with an “F”.[10] DOTX 219 has seating for 20 people, including the engineer: eight people in the rear observation area, four in the galley, four in the server room, and four in the front end.[2]: 2 [1] DOTX 219 is not fitted with cab signalling, automatic train stop, or automatic train control.[10]
The Automated Track Inspection Program (ATIP) is a division of the Federal Railroad Administration (FRA) which oversees automated track inspections on railroads in the United States. At the time, the FRA focused its automated track inspections for frequently used railroad lines, especially lines which carried hazardous materials and passengers. Track inspections would have to be automated, as opposed to manual inspections where subtle track defects would be difficult to identify.[3]
DOTX 219 was built by ENSCO, Plasser & Theurer, and Colorado Railcar, as part of a contract for two new track geometry cars, with the other of which being DOTX 220.[11][12][13]: 223 DOTX 219 and 220 were originally designated as T-19 and T-20 respectively.[3][14] While DOTX 219 was under construction in March 2006, it was scheduled to be shipped from Linz, Austria to Galveston, Texas on December 15, 2006.[14] DOTX 219 was delivered to the FRA in 2007.[12][1][13]: 223 After DOTX 219 and 220 were delivered, there were five track geometry cars owned by the FRA; three were owned by ATIP and two were owned by the Office of Policy and Development.[3][c] The FRA anticipated DOTX 219 to enter service on March 1, 2007.[14] DOTX 219 entered service in late April 2007.[3]

The predominant use of DOTX 219 is to perform track geometry inspections in the United States.[11][7][1] After DOTX 219 entered service, the FRA would increase the frequency of its track inspections; DOTX 219 travelled 9,872 miles (15,887 km) in FY2008–09, and travelled 17,941 miles (28,873 km) in FY2009–10.[13]: 223
Since 2015,[update] DOTX 219 surveys about 30,000 miles (48,000 km) of track annually.[1][11] As of February 4, 2026,[update] DOTX 219 has been used for over 1,400 reports for track defects since January 27, 2016.[15] DOTX 219 is frequently paired with DOTX 223 – a buffer car with no measurement systems – during inspections.[16][9][17][15]
In 2006, ENSCO had contracted the FRA to perform testing with a DOT-111 tank car – which had been fitted with strain gauges, accelerometers, and a transducer for brake pressure – in order to determine the cause for fracturing on stub sills.[18]: 1, 7, 4–16 DOTX 219 was connected with “the instrumented tank car” to provide coordinates and new track geometry data with the data measured by the tank car. From February 28 2010, to March 2, 2010, DOTX 219 and the tank car were moved from Baldwin, Florida to Tampa, Florida. From March 4, 2010 to March 7, 2010, DOTX 219 and the tank car were moved three times between Tampa, Florida and Waycross, Georgia.[18]: 22–23
On April 1, 2011, the FRA published a final rule mandating automated track inspections for tracks with concrete crossties.[4]: 55819 As of February 2026,[update] § 213.234(d) reads as follows:[19]
Performance standard for automated inspection measurement system. The automated inspection measurement system must be capable of indicating and processing rail seat deterioration requirements that specify the following:
- An accuracy, to within 1⁄8 of an inch;
- A distance-based sampling interval, which shall not exceed five feet; and
- Calibration procedures and parameters assigned to the system, which assure that indicated and recorded values accurately represent rail seat deterioration.
On May 27, 2011, Association of American Railroads (AAR) sent a petition of reconsideration to the FRA for § 213.234, arguing that “[the current] automated inspection equipment cannot measure rail seat deterioration at all, let alone within 1⁄8 of an inch”. While the FRA agreed that DOTX 219 could not directly measure rail seat deterioration, they later stated that TRPS could be used to indicate possible locations for rail seat deterioration, after which visual inspections would follow. The FRA further stated that the section as a whole “was never intended to require railroads to detect all areas of rail seat deterioration, but rather to supplement manual visual inspections.”[4]: 55819, 55821
In December 2013, the AAR applied for a waiver to FRA regulations regarding fouling in track ballast. The FRA regulations at that time required fouled ballast to be “remediated within 30 days or to be taken out of service, regardless of track class“. The AAR’s approach managed fouled ballast by track class without a 30-day requirement. The FRA granted the waiver in November 2015, on several conditions; one of which was that automated track inspections would be performed weekly. The waiver was effective from June 17, 2017, to January 31, 2019. DOTX 219 was used for inspections within the waiver’s territories – including railroad lines in Nebraska, Ohio, and Louisiana owned by BNSF Railway – although the inspections with DOTX 219 were part of its regular schedule.[20]: 1, 15–16 [d]
The data collected by DOTX 219 has been used in train derailment investigations. The FRA used data from DOTX 219 for a derailment in Riddleville, Georgia, which occured on August 7, 2015.[21]: 1, 8 DOTX 219 surveyed the location of the derailment on February 19, 2015, and found no defects.[21]: 8 The National Transportation Safety Board (NTSB) launched an investigation for a derailment in Fort Worth, Texas, which occured on April 24, 2019.[22] A track inspection report created with DOTX 219 on April 10, 2012 was used in the investigation.[22][23]
- ^ Some track geometry cars – such as DOTX 217, 218, and 219 – are self-propelled, while others – DOTX 216, 220, and 221 – require towing by a locomotive; however, all cars can be operated while being towed.[8][9]
- ^ The contents of the TDMS can be viewed and edited with the Windows-based program GeoEdit.[2]: 1
- ^ Several track geometry cars were subsequently obtained by the FRA, including DOTX 221, 225, and 226.[8] The FRA also obtained the buffer car DOTX 223 and the hi-rail trucks DOTX 304 and 305.[9]
- ^ DOTX 218, 220, 225, and 226 were predominantly used for inspections in the waiver’s territories.[20]: 15–16
- ^ a b c d e f
Zamora, Eric (May 30, 2015). “Federal ‘safety train’ rolls through Fresno”. Fresno, California: The Fresno Bee. Archived from the original on January 31, 2026. Retrieved January 31, 2026. - ^ a b c d e f FRA DOTX 219 Track Geometry Car System Capabilities (PDF). Federal Railroad Administration; Office of Safety; Automated Track Inspection Program (Report). Department of Transportation. 2007. pp. 1–2. Retrieved January 31, 2026.
- ^ a b c d e f “Deploy two additional automated track geometry inspection vehicles”. FY 2009 Congressional Budget Submission (PDF). United States Department of Transportation; Federal Railroad Administration (Budget Request). 2008. p. 121. Retrieved February 3, 2026.
- ^ a b c Track Safety Standards; Concrete Crossties (PDF). Federal Register (Rule). United States Department of Transportation; Federal Railroad Administration. September 9, 2011. pp. 55819–55825. FRA-2009-0007, Notice No. 4. Retrieved January 31, 2026.
- ^ a b Ho, Carlton; Hyslip, James; Davis, David (March 7, 2008). “Ground Acceleration Based Characterization of High-Speed Rail Track Bed”. GeoCongress 2008. American Society of Civil Engineers: 52–59. doi:10.1061/40972(311)7. Retrieved February 4, 2026.
- ^ a b Ho, Carlton; Hyslip, James; Li, Dingqing (January 2009). “Spectral Analysis of Ground Acceleration-Based Testing”. Transportation Research Record: Journal of the Transportation Research Board. 2117 (1): 50–56. doi:10.3141/2117-07. Retrieved February 4, 2026.
- ^ a b Billingsley, Richard (2021). CSX Transportation. Amberley Publishing. ISBN 978 1 4456 9710 9. Retrieved February 3, 2026.
- ^ a b c “Chapter 3: Track Geometry Inspection Car Operation”. Track and Rail and Infrastructure Integrity Compliance Manual (PDF) (Report). Vol. 1. Federal Railroad Administration. July 2012. p. 1.3.3. Retrieved January 31, 2026.
- ^ a b c “Exhibit D. FRA’s ATIP Fleet, as of October 2021”. FRA Uses Automated Track Inspections To Aid Oversight but Could Improve Related Program Utilization Goals and Track Inspection Reporting (PDF) (Report). Federal Railroad Administration. April 27, 2022. p. 31. ST2022028. Retrieved January 31, 2026.
- ^ a b “37. Handling of FRA Track Geometry Inspection Cars”. System Special Instructions (PDF) (Report). BNSF Railway. April 7, 2010. Retrieved January 31, 2026.
- ^ a b c “В США усиливают меры безопасности при перевозках опасных грузов” [The United States strengthens security measures when transporting dangerous goods] (in Russian). Zdmira. March 13, 2023. Archived from the original on January 31, 2026. Retrieved January 31, 2026.
- ^ a b “ENSCO wins $67m contract with the Federal Railroad Administration”. track and signalling. Rail Technology Magazine. July 24, 2007. Retrieved January 31, 2026.
- ^ a b c “Table 1: Typical Production Miles, FY 2009 to FY 2010”. Railroad Safety Strategy: Progress Assessment – FY 2011 (PDF) (Report). United States Department of Transportation; Federal Railroad Administration. February 2011. p. 223. Retrieved January 31, 2026.
- ^ a b c Knollenberg, John; Wolf, Frank; Rogers, Harold; Tiahrt, Todd; Northup, Anne; Aderholt, Robert; Sweeny, John; Olver, John; Hoyer, Steny; Pastor, Ed; Kilpatrick, Carolyn; Clyburn, James; Rothman, Steven; Culberson, John; Regula, Ralph (2006) [March 7, 2006]. Hearings Before a Subcommittee of the Committee on Appropriations. Departments of Transportation, Treasury, HUD, The Judiciary, District of Columbia, and Independent Agencies Appropriations for 2007 (Report). Washington: U.S. Government Printing Office. pp. 175–176. Retrieved February 3, 2026.
- ^ a b Defects and Violations (Dataset). Railroads. Federal Railroad Administration; United States Department of Transportation. February 6, 2026 [August 22, 2022]. Retrieved February 6, 2026.
- ^ Notice of Intent under the Automated Track Inspection Program (ATIP) (Report). System for Award Management. Retrieved January 31, 2026.
- ^ Rocky Mountain Railroad Club (October 2015). “Information For The Railroad Enthusiast” (PDF). Rocky Mountain Rail Report. No. 651. Denver, Colorado. p. 10. ISSN 1040-9223. Retrieved February 3, 2026.
{{cite magazine}}: CS1 maint: ignored ISSN errors (link) - ^ a b Sundaram, Narayana (December 2016) [July 2014]. Force Environment Evaluation of Stub Sills on Tank Cars Using Autonomous Over-the-Road Testing of the Instrumented Tank Car (PDF). ENSCO (Technical Report). United States Department of Transportation; Federal Railroad Administration. pp. 4–16, 23. DOT/FRA/ORD-11/39. Retrieved February 2, 2026.
- ^ “Performance standard for automated inspection measurement system”. Automated inspection of track constructed with concrete crossties (Section). Code of Federal Regulations. September 9, 2011. 49 CFR 213.234(d). Retrieved February 11, 2026.
- ^ a b Bruzek, Radim; Stark, Timothy; Sussmann, Ted; Tunna, John; Thompson, Hugh (January 15, 2022) [June 12, 2017 – January 31, 2019]. “Fouled Ballast Waiver Operations and Results”. ENSCO. Fouling. DOT/FRA/ORD-22/01. United States Department of Transportation; Federal Railroad Administration. doi:10.13140/RG.2.2.28041.31845. Retrieved February 10, 2026.
- ^ a b Accident Investigation Report (PDF). Federal Railroad Administration; Office of Railroad Safety, Accident and Analysis Branch (Report). Riddleville, Georgia: United States Department of Transportation. August 7, 2015. pp. 1, 8. FRA File #HQ-2015-1082. Retrieved January 31, 2026.
- ^ a b Rail Investigation (Report). Fort Worth, Texas: National Transportation Safety Board. August 19, 2021 [July 19, 2019]. NTSB Number: RRD19FR007. Retrieved January 31, 2026.
- ^ Brock, Martin (April 11, 2012) [April 10, 2012]. Track Geometry Inspection Report. United States Department of Transportation; Federal Railroad Administration; Office of Safety (Report). Fort Worth, Texas to Waxahachie, Texas: ENSCO, Inc. Run ID: 2012041001.



